Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Deck 058: N/A & Scour 113: Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures

Use the filters below to narrow your results.

ObjectID:
Status:
Date:
County 003:
Place 004:
Route 005d:
Direction 005e:
Critical 006b:
Facility 007:
Owner 022:
Built 027:
Lanes 028a:
Traffic 029:
Traffic Year 030:
Service On 042a:
Service Under 042b:
Kind 043a:
Type 043b:
Length 049:
6 (1) · 7 (1) · 8 (1)
Width 052:
Deck 058: (Click arrow to add another value)
Superstructure 059:
Substructure 060:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Deck Type 107:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 4 results in range #1 to #4.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)