Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12223 (1) ·
12228 (1) ·
12239 (1) ·
12247 (1) ·
12256 (1) ·
12258 (1) ·
12261 (1) ·
12262 (1) ·
13663 (1) ·
13679 (1) ·
13680 (1) ·
13706 (1) ·
13707 (1) ·
13771 (1) ·
13778 (1) ·
13779 (1) ·
13780 (1) ·
13781 (1) ·
13784 (1) ·
15200 (1) ·
15201 (1) ·
15206 (1) ·
15207 (1) ·
15222 (1) ·
15270 (1) ·
15279 (1) ·
16062 (1) ·
16063 (1) ·
16083 (1)
None (1) ·
45775 (1) ·
58725 (1) ·
Cocoa (1) ·
DeBary (1) ·
DeLand (1) ·
Fort Pierce (1) ·
Melbourne (1) ·
Micco (1) ·
Ormond Beach (1) ·
Titusville (1) ·
Viera (1)
'Canal ' (1) ·
'Creek ' (1) ·
'DANFORTH CREEK ' (1) ·
'Deep Creek ' (1) ·
'DRAINAGE CANAL ' (1) ·
'FPL Cooling Disch. Canal' (1) ·
'FPL Cooling Intake Canal' (1) ·
'Indian River ' (1) ·
'Lake Dias Creek ' (1) ·
'MANATEE CREEK ' (1) ·
'Rockledge Creek ' (1) ·
'Sebastian Canal ' (1) ·
'Trib to Groover Creek ' (1) ·
'TRIBUTARY OF MANATEE CRE' (1) ·
'TRIBUTARY OF MANATEE CRK' (1) ·
'Underhill Slough ' (1) ·
'Young Canal ' (1) ·
Canal (1)
'Barwick Rd. ' (1) ·
'Barwick Road ' (1) ·
'CR-713 ' (1) ·
'CR-722 (COVE RD) ' (1) ·
'CR-A1A (DIXIE HWY)' (1) ·
'Fort Florida Road ' (1) ·
'Lake Harney Road ' (1) ·
'LEIGHTON FARM AVE ' (1) ·
'Micco Rd. ' (1) ·
'Pinehurst Ave N ' (1) ·
'SR 614 (INDRIO-RD)' (1) ·
'SR-11 ' (1) ·
'SR-40 ' (1) ·
'SR-407 ' (1) ·
'SR-46 ' (1) ·
'SR-520 ' (1) ·
'SR-710 Beeline Hwy' (1) ·
'SR91 NB TPK 144.6 ' (1) ·
'SR91 SB TPK 144.6 ' (1) ·
'Tucker Lane ' (1) ·
'Tymber Creek Road ' (1) ·
Fiske Blvd Ramps (1)
700171 (1) ·
700180 (1) ·
700195 (1) ·
700216 (1) ·
704035 (1) ·
704045 (1) ·
704093 (1) ·
704094 (1) ·
790016 (1) ·
790048 (1) ·
790049 (1) ·
790094 (1) ·
790095 (1) ·
794050 (1) ·
794076 (1) ·
794077 (1) ·
794078 (1) ·
794079 (1) ·
794082 (1) ·
890011 (1) ·
890012 (1) ·
890043 (1) ·
890044 (1) ·
890090 (1) ·
894009 (1) ·
894038 (1) ·
940104 (1) ·
940105 (1) ·
940137 (1)
'0.1 Mile East of A1A ' (1) ·
'0.2 mile west of US-17 ' (1) ·
'0.2Mi S of COVE RD ' (1) ·
'0.2MI SOUTH OF CR-714 ' (1) ·
'0.5 Mile East of U.S 1 ' (1) ·
'0.5Mi E of A1A ' (1) ·
'0.5Mi S of COVE RD ' (1) ·
'0.6 MI E OF I-95 ON SR614' (1) ·
'0.6 Mi S of Flagler Co. ' (1) ·
'0.6MI South of CR-714 ' (1) ·
'0.7 Mi. E. of I-95 ' (1) ·
'0.74 MI N OF ST LUCIE BLV' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'1.2 Mi. W of Barberville ' (1) ·
'1.2 miles South of SR-520' (1) ·
'2 mi West of US-1 ' (1) ·
'2.2 Mi East of SR-528 ' (1) ·
'2.5 Miles South of SR-520' (1) ·
'3.0 miles North of SR-40 ' (1) ·
'3.2 MI W Of Barberville ' (1) ·
'3.2 Mi W of SR-11 ' (1) ·
'4 Mi South of Maytown Rd.' (1) ·
'7.3 Mi N of US-17 ' (1) ·
'8.9 miles west of SR-76 ' (1) ·
I-95 SB Fiske Blvd Ramp (1)
27052013 (1) ·
27081140 (1) ·
27081946 (1) ·
27082843 (1) ·
27083585 (1) ·
27091740 (1) ·
27092679 (1) ·
27173677 (1) ·
27173720 (1) ·
27311800 (1) ·
27525057 (1) ·
28143333 (1) ·
28172130 (1) ·
28194733 (1) ·
28204430 (1) ·
28212138 (1) ·
28283186 (1) ·
28395480 (1) ·
28470565 (1) ·
28504313 (1) ·
28504314 (1) ·
28512260 (1) ·
28512261 (1) ·
29100039 (1) ·
29101536 (1) ·
29104339 (1) ·
29121782 (1) ·
29151565 (1) ·
29174390 (1)
80105691 (1) ·
80105883 (1) ·
80111608 (1) ·
80111763 (1) ·
80174730 (1) ·
80180837 (1) ·
80221024 (1) ·
80221116 (1) ·
80262200 (1) ·
80315950 (1) ·
80341739 (1) ·
80411355 (1) ·
80432467 (1) ·
80443123 (1) ·
80463221 (1) ·
80470960 (1) ·
80512324 (1) ·
80512576 (1) ·
81013072 (1) ·
81074819 (1) ·
81175630 (1) ·
81193011 (1) ·
81193143 (1) ·
81193156 (1) ·
81193290 (1) ·
81193774 (1) ·
81220388 (1) ·
81261295 (1) ·
81280837 (1)
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. (1) ·
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures (1)
Showing below up to 29 results in range #1 to #29.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)