Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'C-18 Canal ' (1) ·
'C-37 Canal ' (1) ·
'City St. & Crane Creek ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'Halifax River IWW ' (1) ·
'I 95 SR 9 ' (1) ·
'Indian River EastRelief ' (1) ·
'Lake Worth Relief ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'Reed Canal ' (1) ·
'West Palm Beach Canal ' (1)
'10th Ave. North ' (1) ·
'Becker Rd. ' (1) ·
'Blue Heron Blvd ' (1) ·
'Clint Moore Road ' (1) ·
'Indiantown Rd. ' (1) ·
'Jupiter Boulevard ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR-40 ' (1) ·
'SR-520 ' (1) ·
'SR-808 Glades Road' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'US-1 ' (1) ·
'US-192 ' (1)
700006 (1) ·
700208 (1) ·
700235 (1) ·
705923 (1) ·
790012 (1) ·
790132 (1) ·
930202 (1) ·
930260 (1) ·
930276 (1) ·
930325 (1) ·
930391 (1) ·
930409 (1) ·
930412 (1) ·
930545 (1) ·
934924 (1) ·
941001 (1)
'.5 mi East of I-95 ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'1 mile N of SR 794 Yamato' (1) ·
'10th Ave over I 95 ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'SR-40 over IWW ' (1) ·
'SR-520 - Banana River ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'SR-A1A East of ICWW ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'US-1 over Reed Canal ' (1) ·
'US-192 - Indian River Rel' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
10319 (1) ·
107570 (1) ·
113642 (1) ·
15268 (1) ·
171592 (1) ·
26546 (1) ·
40772 (1) ·
45978 (1) ·
49448 (1) ·
51387 (1) ·
56821 (1) ·
59858 (1) ·
62460 (1) ·
64195 (1) ·
75472 (1)
Showing below up to 16 results in range #1 to #16.