Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Donald Ross Road ' (1) ·
'E-3 Canal ' (1) ·
'Halifax River ' (1) ·
'I-95 ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Summit Boulevard ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
'WEST PALM BEACH CANAL ' (1)
'45TH STREET ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'Malabar Rd ' (1) ·
'Minton Rd. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'Orange Avenue ' (1) ·
'Pineda Causeway ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SW 15TH AVE ' (1) ·
'West Atlantic Ave.' (1)
700225 (1) ·
704143 (1) ·
705953 (1) ·
794120 (1) ·
884056 (1) ·
930215 (1) ·
930240 (1) ·
930292 (1) ·
930373 (1) ·
930383 (1) ·
934100 (1) ·
934293 (1) ·
934461 (1) ·
937715 (1) ·
940142 (1)
'.75 miles South of SR-882' (1) ·
'0.1 mi E of Minton Rd ' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'250ft North of SR-60 ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'Minton Road-I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
123619 (1) ·
13132 (1) ·
171592 (1) ·
18365 (1) ·
199525 (1) ·
2000 (1) ·
23686 (1) ·
23943 (1) ·
27000 (1) ·
39905 (1) ·
44243 (1) ·
74605 (1) ·
75472 (1) ·
76340 (1) ·
93690 (1)
Showing below up to 15 results in range #1 to #15.