Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'E-3 Canal ' (1) ·
'E3 CANAL ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I-95 ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'RCA CANAL ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Summit Boulevard ' (1)
'27th Street ' (1) ·
'45TH STREET ' (1) ·
'CONGRESS AVE ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Malabar Rd ' (1) ·
'Minton Rd. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NW 13 ST ' (1) ·
'Pineda Causeway ' (1) ·
'Port St. Lucie Bld' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR-15 Main St. ' (1) ·
'SUMMIT BLVD ' (1) ·
'West Atlantic Ave.' (1)
700225 (1) ·
704143 (1) ·
705953 (1) ·
884077 (1) ·
930215 (1) ·
930240 (1) ·
930292 (1) ·
930338 (1) ·
934100 (1) ·
934139 (1) ·
934228 (1) ·
934258 (1) ·
934499 (1) ·
934964 (1) ·
934965 (1) ·
935215 (1) ·
940142 (1)
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.1 mi E of Minton Rd ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'At East Canal St. ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Minton Road-I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.