Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berrys Canal ' (1) ·
'C-15 Canal ' (1) ·
'C-17 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'E-2W Canal ' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'Header Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Indian River East Relief' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'KRUEGER CREEK ' (1) ·
'LWDD L30 Canal ' (1) ·
'Palm Beach Canal C-51 ' (1) ·
'South Relief Canal ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-44 ' (1) ·
'SR-91 N/S TPK ' (1) ·
'ST. LUCIE RIVER ' (1) ·
'US-1 & FECRR ' (1) ·
'US-92 ' (1) ·
'W Camino Real ' (1) ·
'W. Camino Real ' (1)
'CR-A1A(OCEAN BLVD)' (1) ·
'EB SR 704 ' (1) ·
'EB SR 786 ' (1) ·
'Emerson Ave 27th A' (1) ·
'Hagen Ranch Road ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'LYONS ROAD ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'Peninsula Corp Dr ' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-44 ' (1) ·
'SR-5/S. Olive Ave.' (1) ·
'SR-732 Jensen Bch.' (1) ·
'SR91 On/Off Rmp106' (1) ·
'W/B Atlantic Ave ' (1) ·
'WB SR 70 ' (1)
790064 (1) ·
790072 (1) ·
790128 (1) ·
790149 (1) ·
880088 (1) ·
890120 (1) ·
890146 (1) ·
930184 (1) ·
930187 (1) ·
930198 (1) ·
930210 (1) ·
930367 (1) ·
930440 (1) ·
930442 (1) ·
930491 (1) ·
931011 (1) ·
934116 (1) ·
934731 (1) ·
934908 (1) ·
934958 (1) ·
940119 (1) ·
944011 (1) ·
944012 (1)
'.5mi East US1 Lakeworth ' (1) ·
'.75mi E. of Indian R Dr. ' (1) ·
'.7mi. E of Congress Ave. ' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.8 MI W OF US-1 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.9 MI W OF US-1 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.3mi. South of Linton ' (1) ·
'1st overpass east of I-95' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'2MI E of SR-76 ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 over US-1 ' (1) ·
'SR-710 TPK Interchange ' (1)
26203900 (1) ·
26210242 (1) ·
26251444 (1) ·
26252840 (1) ·
26271450 (1) ·
26290179 (1) ·
26383900 (1) ·
26404575 (1) ·
26422136 (1) ·
26481194 (1) ·
26485165 (1) ·
26503600 (1) ·
27115100 (1) ·
27151700 (1) ·
27192572 (1) ·
27193001 (1) ·
27222475 (1) ·
27355287 (1) ·
29004602 (1) ·
29011550 (1) ·
29014148 (1) ·
29102131 (1)
80030866 (1) ·
80042484 (1) ·
80043210 (1) ·
80043390 (1) ·
80052490 (1) ·
80052546 (1) ·
80054600 (1) ·
80070450 (1) ·
80070535 (1) ·
80075297 (1) ·
80094882 (1) ·
80102980 (1) ·
80110316 (1) ·
80124800 (1) ·
80135670 (1) ·
80195964 (1) ·
80200618 (1) ·
80245043 (1) ·
80295022 (1) ·
80551845 (1) ·
80553031 (1) ·
80591757 (1) ·
81050336 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.