Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Donald Ross Road ' (1) ·
'Halifax River ' (1) ·
'I-4 ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'SR-520 ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'US-1 ' (1) ·
'W.P.B. Canal (C-51) ' (1) ·
'West Palm Beach Canal ' (1)
'BINKS FOREST DRIVE' (1) ·
'CENTRE PARK BLVD. ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'Orange Avenue ' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-520 EB ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SW 15TH AVE ' (1) ·
'US-1 (SR-5) ' (1)
700052 (1) ·
700127 (1) ·
700220 (1) ·
790082 (1) ·
790166 (1) ·
790167 (1) ·
794120 (1) ·
880085 (1) ·
884056 (1) ·
930373 (1) ·
930383 (1) ·
930410 (1) ·
934259 (1) ·
934293 (1) ·
934461 (1) ·
937715 (1) ·
940009 (1)
'.75 miles South of SR-882' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2 MI SOUTH OF 45TH ST ' (1) ·
'0.25 Mi E of US-1 SR-5 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'250ft North of SR-60 ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-520 EB - Banana River ' (1) ·
'SR-7 & SR-80 intersection' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.