Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'E-3 Canal ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'I-95 ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD L-2 CANAL ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'ST LUCIE CANAL ' (1) ·
'St. Lucie River/SR-707 ' (1) ·
'Summit Boulevard ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1)
'45TH STREET ' (1) ·
'CONGRESS AVE ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'Malabar Rd ' (1) ·
'Minton Rd. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB SR 807 ' (1) ·
'PARK AVE. W. ' (1) ·
'Pineda Causeway ' (1) ·
'Port St. Lucie Bld' (1) ·
'SB US-1/SR-5 ' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'US-98 (SR-80) ' (1) ·
'West Atlantic Ave.' (1)
700225 (1) ·
704143 (1) ·
705953 (1) ·
790196 (1) ·
790197 (1) ·
890066 (1) ·
890151 (1) ·
930053 (1) ·
930215 (1) ·
930240 (1) ·
930292 (1) ·
930475 (1) ·
934100 (1) ·
934164 (1) ·
934251 (1) ·
940142 (1)
'.25m W of US-1 on US-98 ' (1) ·
'0.1 mi E of Minton Rd ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'1mi S of SR-707 on SR-5 ' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'Minton Road-I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SE quadrant PB Int Airpt ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.