Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BELCHER CANAL C-25 ' (1) ·
'BRITT CANAL ' (1) ·
'C-18 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL-1 ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'Intracoastal Waterway ' (1) ·
'L.W.D.D. #10 ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'MOORES CREEK ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'TEN MILE CREEK ' (1)
'53RD STREET ' (1) ·
'BRITT RD ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'DAVIS ROAD ' (1) ·
'EB PGA Blvd. ' (1) ·
'ELEVEN MILE ROAD ' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'RANGE LINERD CR609' (1) ·
'SE HARBOR ISLAND ' (1) ·
'SHINN RD (CR-609A)' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'STAR ISLAND WAY ' (1) ·
'TAYLOR DAIRY ROAD ' (1) ·
'WB PGA Blvd. ' (1)
880047 (1) ·
890066 (1) ·
890079 (1) ·
894000 (1) ·
894017 (1) ·
894018 (1) ·
930106 (1) ·
930241 (1) ·
930349 (1) ·
930356 (1) ·
937201 (1) ·
940009 (1) ·
940020 (1) ·
940026 (1) ·
940027 (1) ·
940038 (1) ·
940041 (1) ·
940043 (1) ·
940068 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.2Mi E of GOMEZ AVE. ' (1) ·
'0.3Mi E of GOMEZ AVE. ' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.6MI N OF ANGLE ROAD ' (1) ·
'0.8 MI S OF SR-70 ' (1) ·
'1.1 MILES NORTH OF SR-70 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'100FT N ANGLE RD CR-607A ' (1) ·
'1Mi W of US-1 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'3MI W OF CR-615 ' (1) ·
'ADJ TO CR-607A ANGLE RD ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.