Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal ' (1) ·
'Drainage Canal ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'FL. TURNPIKE ' (1) ·
'Header Canal ' (1) ·
'JONES CREEK ' (1) ·
'Kings Road ' (1) ·
'Konomac Canal ' (1) ·
'None ' (1) ·
'Pine Street ' (1) ·
'ROY'S SWALE ' (1) ·
'SR 91 TPK ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'CENTER STREET ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'Fort Florida Road ' (1) ·
'HOOD RD 110.944 ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'NB I 95 to Gateway' (1) ·
'Old Dixie Highway ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SILVER FOX LANE ' (1) ·
'SR-407 ' (1) ·
'SR-528 EB ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SW 18TH ST. EB ' (1) ·
'WB SR 70 ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
700090 (1) ·
700151 (1) ·
794123 (1) ·
794124 (1) ·
794162 (1) ·
890121 (1) ·
894042 (1) ·
930435 (1) ·
930441 (1) ·
934147 (1) ·
934360 (1) ·
934926 (1) ·
934945 (1) ·
934946 (1) ·
934948 (1) ·
940119 (1) ·
940143 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.5Mi S of SR-710 ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'2.2 mi West of US-17/92 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'SR-528 EB over Pine St. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)