Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'10th Ave North ' (1) ·
'E Gateway Blvd ' (1) ·
'EB US 98 SR 80 ' (1) ·
'French Avenue ' (1) ·
'NB SR-5 (US-1) ' (1) ·
'Peninsula Corp Dr ' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SB SR-5 (US-1) ' (1) ·
'SR 804 ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-44 ' (1) ·
'US-1 SB ' (1) ·
'WB US 98 SR 80 ' (1) ·
'Woolbright Road ' (1)
700002 (1) ·
700103 (1) ·
704150 (1) ·
704151 (1) ·
790004 (1) ·
790176 (1) ·
794006 (1) ·
890001 (1) ·
890021 (1) ·
930263 (1) ·
930289 (1) ·
930300 (1) ·
930433 (1) ·
930443 (1) ·
930461 (1) ·
930524 (1)
'1.3 mile S of Linton Rd. ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'2 miles West of US-17 ' (1) ·
'Just West of I 95 ' (1) ·
'NB SR-5 1mi. S of CR 708 ' (1) ·
'SB SR-5 1mi. S of CR 708 ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-44 over CSX-RR ' (1) ·
'US-1 SB over FECRR ' (1) ·
'W of I 95 on Woolbright ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)