Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890153 (1) ·
890154 (1) ·
890155 (1) ·
890156 (1) ·
890157 (1) ·
930091 (1) ·
930354 (1) ·
930355 (1) ·
930402 (1) ·
930407 (1) ·
930408 (1) ·
930451 (1) ·
930465 (1) ·
930474 (1)
'11.4Mi N of Palm Beach Co' (1) ·
'16Mi W of SR-7 ' (1) ·
'3.9Mi N. of Palm Beach Co' (1) ·
'3Mi. S of CR-717 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'4.7Mi N. of Palm Beach Co' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-700 CANAL POINT ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)