Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'C-51 Canal ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'Canal - D ' (1) ·
'CANAL L-12 ' (1) ·
'Drainage Canal ' (1) ·
'Drainage Canal Sand Cut ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'I 95 SR 9 ' (1) ·
'LEVEE NO. 8 ' (1) ·
'LEVEE NO.8 ' (1) ·
'Raulerson Canal ' (1) ·
'Stub Canal & S.F.R.C. ' (1)
'EB US 98 SR 80 ' (1) ·
'Kings Highway ' (1) ·
'NBSR807 to EBSR80 ' (1) ·
'SR-700 ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-80 EB ' (1) ·
'SR-80 WB ' (1) ·
'SR-80EB (Southern)' (1) ·
'SR-80WB (Southern)' (1) ·
'US-98 (SR-80) ' (1) ·
'US-98 SR700 US441 ' (1) ·
'US98/441 SR15/700 ' (1) ·
'US98&441 SR700&15' (1) ·
'WB US 98 SR 80 ' (1)
890153 (1) ·
890154 (1) ·
890155 (1) ·
890156 (1) ·
890157 (1) ·
930053 (1) ·
930091 (1) ·
930354 (1) ·
930355 (1) ·
930402 (1) ·
930407 (1) ·
930408 (1) ·
930451 (1) ·
930461 (1) ·
930465 (1) ·
930474 (1) ·
930524 (1) ·
930539 (1) ·
940007 (1) ·
940143 (1)
'.25m W of US-1 on US-98 ' (1) ·
'.5mi So. of St Lucie Blvd' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'11.4Mi N of Palm Beach Co' (1) ·
'16Mi W of SR-7 ' (1) ·
'3.9Mi N. of Palm Beach Co' (1) ·
'3Mi. S of CR-717 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'4.1Mi N of WPB Canal ' (1) ·
'4.7Mi N. of Palm Beach Co' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'PUMP STA AT 20 MI BEND ' (1) ·
'PUMP STA. AT 20 MI. BEND ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 80 / I-95 Interchange ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'SR-700 CANAL POINT ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)