Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'Banana River ' (1) ·
'BOYNTON CANAL ' (1) ·
'C-18 Canal ' (1) ·
'Dirksen Dr ' (1) ·
'FECRR - Tymber Crk Rd ' (1) ·
'I-4 ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'Main Canal ' (1) ·
'SR-520 ' (1) ·
'St Johns River Relief ' (1) ·
'ST LUCIE CANAL ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'US-1 ' (1) ·
'W. Relief Indian River ' (1)
'Banana River Drive' (1) ·
'CLINT MOORE RD ' (1) ·
'Enterprise Rd. ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 EB ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Indiantown Rd. ' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'LYONS ROAD ' (1) ·
'PIONEER ROAD ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-60 Osceola Blvd' (1) ·
'US-192 WB ' (1)
700023 (1) ·
700052 (1) ·
704063 (1) ·
790080 (1) ·
790081 (1) ·
790083 (1) ·
790100 (1) ·
790191 (1) ·
880030 (1) ·
890066 (1) ·
890138 (1) ·
930273 (1) ·
930391 (1) ·
934221 (1) ·
934929 (1) ·
934953 (1) ·
940009 (1)
'.5 mi East of I-95 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'AT US-441 SR-7 ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-95 NB over FECRR ' (1) ·
'I-95 NB over US-1 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB over FECRR ' (1) ·
'US-192 WB-St Johns Relief' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)