Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700075 (1) ·
700085 (1) ·
700087 (1) ·
700090 (1) ·
700091 (1) ·
700141 (1) ·
700151 (1) ·
790022 (1) ·
790107 (1) ·
930001 (1) ·
930072 (1) ·
930265 (1) ·
930325 (1) ·
934213 (1) ·
936801 (1) ·
937003 (1)
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'2.9 Mi East of SR-528 ' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'I-4 EB over I-95 ' (1) ·
'I-4 WB over I-95 ' (1) ·
'SR-407 NB at SR-528 WB ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 SB - SR-404 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)