Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF ICWW ' (1) ·
'C-18 Canal ' (1) ·
'Donald Ross Road ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'JONES CREEK ' (1) ·
'Jupiter Creek ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'SIMS CREEK ' (1) ·
'SLOUGH ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SR-706 Indiantown Rd. ' (1) ·
'SW FORK LOXAHATCHEE RVR ' (1)
'CENTER STREET ' (1) ·
'CENTRAL BLVD ' (1) ·
'Indiantown Rd. ' (1) ·
'Indiantown Road ' (1) ·
'JUPITER BEACH RD ' (1) ·
'NB I 95 SR9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'US-1 (SR-5) ' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
930005 (1) ·
930241 (1) ·
930371 (1) ·
930372 (1) ·
930380 (1) ·
930383 (1) ·
930385 (1) ·
930390 (1) ·
930391 (1) ·
930392 (1) ·
930394 (1) ·
930420 (1) ·
934125 (1) ·
934142 (1) ·
934144 (1) ·
934146 (1) ·
934147 (1)
'.5 mi East of I-95 ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.3MI N of SR-706 ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'Jupiter Interchange/I-95 ' (1) ·
'SR 706 to I 95 Ramp ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)