Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CORAL DRIVE ' (1) ·
'E Gateway Blvd ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'GATEWAY BLVD (WB) ' (1) ·
'HYPOLUXO RD. ' (1) ·
'LAWRENCE ROAD ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'MINER RD. ' (1) ·
'Quantum Blvd. ' (1) ·
'SEACREST BLVD. ' (1) ·
'SW 15TH AVE ' (1) ·
'SW 23RD AVE. ' (1) ·
'VENICE DRIVE ' (1) ·
'WEST OCEAN DRIVE ' (1) ·
'Woolbright Road ' (1)
930300 (1) ·
930302 (1) ·
930433 (1) ·
930434 (1) ·
934344 (1) ·
934461 (1) ·
934499 (1) ·
934914 (1) ·
934934 (1) ·
934935 (1) ·
934942 (1) ·
934948 (1) ·
935300 (1) ·
935301 (1) ·
935302 (1) ·
935307 (1) ·
935308 (1) ·
936375 (1)
'0.19Mi. E of Congress Ave' (1) ·
'0.1MI S OF OLD BOYNTON ' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'W of I 95 on Woolbright ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)