Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'10th Ave. North ' (1) ·
'10th Ave North ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'I 95 SR 9 ' (1) ·
'IBIS WAY ' (1) ·
'KELLER ROAD ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR802 (Lake Worth)' (1)
930073 (1) ·
930260 (1) ·
930263 (1) ·
930273 (1) ·
930318 (1) ·
930373 (1) ·
930508 (1) ·
931006 (1) ·
934275 (1) ·
934276 (1) ·
934940 (1) ·
936350 (1) ·
936801 (1)
'.4mi. East of Congress ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5MI EAST OF I-95 ' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'10th Ave over I 95 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'Lake Ave. / ICWW ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12752 (1) ·
1500 (1) ·
171592 (1) ·
196055 (1) ·
330518 (1) ·
36435 (1) ·
39905 (1) ·
41640 (1) ·
49448 (1) ·
5205 (1) ·
521 (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)