Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'CANAL L-30 ' (1) ·
'CPB20 CANAL ' (1) ·
'CSX Railroad ' (1) ·
'Cypress Creek ' (1) ·
'EL RIO CANAL ' (1) ·
'HOWARD CREEK ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'Lake Ida Canal E-4 ' (1) ·
'Lateral Canal 30 ' (1) ·
'M-1 CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Sykes Creek ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'EL CLAIR RANCH RD.' (1) ·
'I 95 SR 9 ' (1) ·
'NW 7TH STREET ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'Peninsula Corp Dr ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'Sea Ray Drive ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR 710 ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR510 Wabasso Road' (1) ·
'US-1 (SR-5) ' (1) ·
'WESTMORELAND BLVD ' (1)
704144 (1) ·
880050 (1) ·
880052 (1) ·
880085 (1) ·
890115 (1) ·
930373 (1) ·
930443 (1) ·
930455 (1) ·
930490 (1) ·
930534 (1) ·
934220 (1) ·
934222 (1) ·
934419 (1) ·
935221 (1) ·
937360 (1) ·
945250 (1)
'.75 miles South of SR-882' (1) ·
'0.05 MI W of NW 4TH AVE ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.6MI W OF US-1 ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.2Mi N OF LAKE IDA RD. ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'1.9mi W of N Banana Ri Dr' (1) ·
'2 miles N of Atlantic Ave' (1) ·
'2.5 miles North of SR-706' (1) ·
'2.7 miles N of SR 806 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
Bridge closed because of channel failure. Corrective action may put back in light service. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
11971 (1) ·
1350 (1) ·
1390 (1) ·
19606 (1) ·
23076 (1) ·
27413 (1) ·
339472 (1) ·
34526 (1) ·
352347 (1) ·
36435 (1) ·
39905 (1) ·
51182 (1) ·
511825 (1) ·
7000 (1) ·
70268 (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)