Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'C-18 CANAL ' (1) ·
'C-3 Canal ' (1) ·
'C-51 Canal ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'Canal ' (1) ·
'CLEAR LAKE ' (1) ·
'CORAL GARDENS OUTFALL ' (1) ·
'Drainage Canal ' (1) ·
'Groover Creek ' (1) ·
'L-5 Canal ' (1) ·
'Little Haw Creek ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'RCA CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'Salerno Creek ' (1) ·
'St Johns River Relief ' (1)
'Airport Road ' (1) ·
'ALLAMANDA BLVD. ' (1) ·
'AUDUBON CSWY ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'CONGRESS AVE ' (1) ·
'EB SR60 ' (1) ·
'Hurley Blvd ' (1) ·
'Jupiter Blvd. ' (1) ·
'Lake Ida Road ' (1) ·
'Marsh Road ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'NORFOLK BLVD. ' (1) ·
'Old Dixie Highway ' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'PROSPERITY FARM RD' (1) ·
'SB US-27 SR-25 ' (1) ·
'SE Ebbtide Ave. ' (1) ·
'SR-415 ' (1) ·
'SR-60 WB ' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'WEST OCEAN DRIVE ' (1)
705909 (1) ·
705919 (1) ·
790198 (1) ·
794036 (1) ·
794067 (1) ·
794123 (1) ·
794124 (1) ·
884057 (1) ·
884059 (1) ·
894047 (1) ·
894055 (1) ·
930352 (1) ·
930356 (1) ·
934137 (1) ·
934139 (1) ·
934277 (1) ·
934299 (1) ·
934491 (1) ·
934934 (1) ·
934935 (1) ·
934963 (1) ·
935300 (1) ·
936451 (1) ·
937003 (1) ·
937707 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1Mi E of Tymber Crk Rd.' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.4MI E OF CONGRESS AVE ' (1) ·
'0.4MI N of COVE ROAD ' (1) ·
'0.5MI S OF P.B. LAKES BLV' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.1 miles North of US-92 ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'At US-441 Southern Blvd ' (1) ·
'Palm Beach - Broward Line' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-415 - St Johns Relief ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1)
26200870 (1) ·
26282306 (1) ·
26312770 (1) ·
26322014 (1) ·
26322160 (1) ·
26335150 (1) ·
26405650 (1) ·
26430400 (1) ·
26430410 (1) ·
26494723 (1) ·
26501410 (1) ·
26502431 (1) ·
26512989 (1) ·
27083630 (1) ·
27090600 (1) ·
27385855 (1) ·
27385856 (1) ·
27591529 (1) ·
28004888 (1) ·
28485599 (1) ·
29043231 (1) ·
29162604 (1) ·
29210415 (1) ·
29211227 (1)
80024030 (1) ·
80040030 (1) ·
80040084 (1) ·
80041852 (1) ·
80042035 (1) ·
80043826 (1) ·
80050324 (1) ·
80052654 (1) ·
80062196 (1) ·
80072177 (1) ·
80072244 (1) ·
80095948 (1) ·
80120030 (1) ·
80142967 (1) ·
80170170 (1) ·
80225809 (1) ·
80225872 (1) ·
80321939 (1) ·
80414817 (1) ·
80424640 (1) ·
81055781 (1) ·
81060905 (1) ·
81074043 (1) ·
81112589 (1) ·
81162375 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.