Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Cypress Creek ' (1) ·
'E-2W Canal ' (1) ·
'FL. TURNPIKE ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Header Canal ' (1) ·
'I-95 ' (1) ·
'Intracoastal Waterway ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'Old Dixie Hwy. & FEC RR ' (1) ·
'Pine Street ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Tillman Canal ' (1)
'CR-611 43RD AVE. ' (1) ·
'I-95 NB ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-5 (US-1) NB ' (1) ·
'SR-528 EB ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'SW 18TH ST. EB ' (1) ·
'US-1 (SR-5) SB ' (1) ·
'W/B Atlantic Ave ' (1) ·
'WB Forest Hill Bld' (1) ·
'WB PGA Blvd. ' (1) ·
'WB SR 70 ' (1) ·
'WB SR 786 ' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
700119 (1) ·
700151 (1) ·
700198 (1) ·
880103 (1) ·
880104 (1) ·
884056 (1) ·
890115 (1) ·
930349 (1) ·
930440 (1) ·
930492 (1) ·
930514 (1) ·
934148 (1) ·
934149 (1) ·
934926 (1) ·
934945 (1) ·
934946 (1) ·
940119 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1st overpass east of I-95' (1) ·
'2.1 Miles S of Oslo Rd. ' (1) ·
'2.5 miles North of SR-706' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'250ft North of SR-60 ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 EB over Pine St. ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)