Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'C.S.X. R/R ' (1) ·
'City St. & Crane Creek ' (1) ·
'CSX RR ' (1) ·
'E-1 Canal ' (1) ·
'E-2 East Canal ' (1) ·
'E-2 West Canal ' (1) ·
'E-2-E Canal ' (1) ·
'E-3 Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'L-6 Canal ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Summit Boulevard ' (1) ·
'West Palm Beach Canal ' (1) ·
'WPB Canal (C-51) ' (1) ·
'WPB STUB CANAL ' (1) ·
Horse Creek (1)
'45TH STREET ' (1) ·
'BELVEDERE RD ' (1) ·
'E Gateway Blvd ' (1) ·
'Forest Hill Blvd. ' (1) ·
'Haverhill Rd ' (1) ·
'Hypoluxo Rd ' (1) ·
'Lake Worth Road ' (1) ·
'Malabar Rd ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 804 ' (1) ·
'SR-807 Congress Av' (1) ·
'SR-808 Glades Road' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'US-1 ' (1) ·
'West Atlantic Ave.' (1) ·
'Woolbright Road ' (1) ·
US-1 (1)
700006 (1) ·
700206 (1) ·
705953 (1) ·
930240 (1) ·
930289 (1) ·
930292 (1) ·
930300 (1) ·
930325 (1) ·
930409 (1) ·
930412 (1) ·
930414 (1) ·
930415 (1) ·
930433 (1) ·
930434 (1) ·
930446 (1) ·
930456 (1) ·
930466 (1) ·
931006 (1) ·
934100 (1) ·
934208 (1) ·
934295 (1) ·
934362 (1) ·
940101 (1)
'0.1 mi E of Minton Rd ' (1) ·
'0.1MI W OF I-95 ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Glades Rd. & Turnpike ' (1) ·
'Just West of I 95 ' (1) ·
'Just west of I-95 ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1) ·
'US-1 - Crane Cr & City St' (1) ·
'W of I 95 on Woolbright ' (1) ·
US-1 over Horse Creek (1)
26220391 (1) ·
26220396 (1) ·
26220527 (1) ·
26221756 (1) ·
26271349 (1) ·
26272749 (1) ·
26305200 (1) ·
26314400 (1) ·
26330210 (1) ·
26330220 (1) ·
26341358 (1) ·
26370347 (1) ·
26391800 (1) ·
26394300 (1) ·
26395750 (1) ·
26403896 (1) ·
26404695 (1) ·
26412668 (1) ·
26453191 (1) ·
27245841 (1) ·
27595668 (1) ·
28043878 (1) ·
28100028 (1)
80041240 (1) ·
80041480 (1) ·
80041485 (1) ·
80041580 (1) ·
80041600 (1) ·
80042680 (1) ·
80042770 (1) ·
80051756 (1) ·
80051800 (1) ·
80071317 (1) ·
80074659 (1) ·
80075082 (1) ·
80101354 (1) ·
80101504 (1) ·
80101677 (1) ·
80102258 (1) ·
80102834 (1) ·
80120775 (1) ·
80121946 (1) ·
80231922 (1) ·
80360835 (1) ·
80384071 (1) ·
80401800 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.