Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C STANLEY WEAVER CANAL ' (1) ·
'Canal - D ' (1) ·
'CANAL E-4 ' (1) ·
'CITY OF WPB CANAL ' (1) ·
'FISHTAIL CANAL ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'KELLER CANAL E-4 ' (1) ·
'LIPTOG CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'LWDD L30 Canal ' (1) ·
'LWDD LAT 30 CANAL ' (1) ·
'OCEAN CANAL L-13 ' (1) ·
'Reed Canal ' (1) ·
'SFC CANAL NO 1 ' (1)
'10TH AVE. NORTH ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'BARWICK RD ' (1) ·
'DATE PALM ROAD ' (1) ·
'Hagen Ranch Road ' (1) ·
'Haverhill Rd ' (1) ·
'KELLER ROAD ' (1) ·
'LAKE IDA ROAD ' (1) ·
'S. VERDE TRAIL ' (1) ·
'SAM SENTER RD ' (1) ·
'SR-715 ' (1) ·
'US-1 ' (1) ·
'US-98 (SR-80) ' (1) ·
'VILLAGE BLVD (NB) ' (1) ·
'VILLAGE BLVD (SB) ' (1) ·
'W LAKE RD CR-717 ' (1)
790012 (1) ·
930107 (1) ·
930402 (1) ·
930471 (1) ·
934278 (1) ·
934359 (1) ·
934455 (1) ·
934505 (1) ·
934513 (1) ·
934903 (1) ·
934950 (1) ·
934958 (1) ·
934965 (1) ·
935203 (1) ·
936350 (1) ·
937703 (1) ·
937710 (1) ·
937711 (1)
'0.2 MI W of I-95 ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.3MI S OF 45TH STREET ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.7MI N OF LAKE IDA ROAD ' (1) ·
'0.8MI N OF BOYNTON BCH BD' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'2.0 Miles N of SR-806 ' (1) ·
'2Mi S of 45TH ST CR-702 ' (1) ·
'4 miles west of SR 7 ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'At S Military Trail ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'US-1 over Reed Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)