Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvede to NB I-95' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'Saxon Blvd EB ' (1) ·
'Saxon Blvd WB ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 152.9 ' (1)
700029 (1) ·
700116 (1) ·
790166 (1) ·
790167 (1) ·
890117 (1) ·
890118 (1) ·
930477 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930485 (1) ·
940053 (1) ·
940121 (1)
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'North of Belvedere Rd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-405 WB - US-1 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)