Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR709 GLADES RD & FEC RR' (1) ·
'FECRR ' (1) ·
'FELLSMERE CANAL ' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L.W.D.D. E-4 CANAL ' (1) ·
'LOXAHATCHEE RIV NW FORK ' (1) ·
'ORANGE CANAL ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'US-1 ' (1) ·
'US-1 & FECRR ' (1) ·
Six Mile Creek (1)
'COUNTY RD 507 ' (1) ·
'CR-726 CITRUS BLVD' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'ISLAND WAY ' (1) ·
'OLD GERMANTOWN RD ' (1) ·
'SR A1A ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
SR-46 (1)
700002 (1) ·
700014 (1) ·
700029 (1) ·
700103 (1) ·
700108 (1) ·
700116 (1) ·
700194 (1) ·
880076 (1) ·
890107 (1) ·
894029 (1) ·
894044 (1) ·
934482 (1) ·
940076 (1) ·
940084 (1) ·
940121 (1) ·
940951 (1)
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.37MI N OF SR-712 ' (1) ·
'0.4 MI W OF CONGRESS AVE ' (1) ·
'0.5Mi N of PLMBCH CO LINE' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'4.2MI N OF CR-512 ' (1) ·
'5.8Mi. E of SR-710 ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 EB - US-1 ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-405 WB - US-1 ' (1) ·
'SR-528 EB - US-1& FECRR ' (1) ·
'SR-528 WB - US-1 & FECRR ' (1) ·
SR-46 over Six Mile Cr (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)