Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'Belvedere Road ' (1) ·
'I 95 and SR 704 ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Loxahatchee River ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'Summit Boulevard ' (1)
'Belvede to NB I-95' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'Riverbend Park Rd ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'WB SR704 to SB I95' (1)
930235 (1) ·
930291 (1) ·
930292 (1) ·
930469 (1) ·
930477 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930485 (1) ·
930486 (1) ·
930487 (1) ·
930494 (1) ·
934176 (1)
'0.3 Mi S of Indiantown Rd' (1) ·
'0.3 mile North of SR 80 ' (1) ·
'1 mile North of SR 80 ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'North of Belvedere Rd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB Ramp to WPB Airport ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
10063 (1) ·
119194 (1) ·
12666 (1) ·
17350 (1) ·
198658 (1) ·
19952 (1) ·
199525 (1) ·
27760 (1) ·
625 (1) ·
8328 (1) ·
9196 (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)