Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belvedere Road ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'Donald Ross Road ' (1) ·
'FEC RR & Georgia Ave. ' (1) ·
'FECRR ' (1) ·
'HAULOVER CANAL ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'Intracoastal Waterway ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'OKEECHOBEE RIM CANAL ' (1) ·
'SR-68 ' (1) ·
'ST LUCIE CANAL ' (1) ·
'TEN MILE CREEK ' (1)
'Atlantic Avenue ' (1) ·
'COURTENAY PARKWAY ' (1) ·
'CR-717 ' (1) ·
'CR708 SE BRIDGE RD' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NW 2ND ST ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-80 ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-1 SB ' (1) ·
'US-98 (SR-80) ' (1)
703004 (1) ·
790004 (1) ·
890066 (1) ·
890083 (1) ·
890107 (1) ·
930005 (1) ·
930029 (1) ·
930053 (1) ·
930064 (1) ·
930072 (1) ·
930318 (1) ·
930360 (1) ·
930383 (1) ·
930486 (1) ·
930487 (1) ·
934160 (1) ·
934161 (1) ·
934908 (1) ·
940072 (1) ·
940076 (1) ·
940096 (1) ·
940097 (1) ·
940951 (1)
'.25m W of US-1 on US-98 ' (1) ·
'.2mi East of US-27 ' (1) ·
'0.37MI N OF SR-712 ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 M E OF US-1 ON CR-708' (1) ·
'1 mile North of SR 80 ' (1) ·
'1.9 MI WEST OF SR-715 ' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'Just North of SR70 on I95' (1) ·
'Lake Ave. / ICWW ' (1) ·
'US-1 SB over FECRR ' (1)
26210242 (1) ·
26274181 (1) ·
26365576 (1) ·
26395130 (1) ·
26403272 (1) ·
26411370 (1) ·
26412597 (1) ·
26412600 (1) ·
26421986 (1) ·
26525465 (1) ·
26525529 (1) ·
26525862 (1) ·
26564568 (1) ·
27035280 (1) ·
27070362 (1) ·
27121998 (1) ·
27224619 (1) ·
27224640 (1) ·
27240944 (1) ·
27264995 (1) ·
27265210 (1) ·
28441095 (1) ·
28493748 (1)
80024618 (1) ·
80033598 (1) ·
80035127 (1) ·
80035976 (1) ·
80040125 (1) ·
80040991 (1) ·
80040992 (1) ·
80043210 (1) ·
80050482 (1) ·
80072029 (1) ·
80074066 (1) ·
80162980 (1) ·
80195431 (1) ·
80231097 (1) ·
80231141 (1) ·
80233690 (1) ·
80233991 (1) ·
80235220 (1) ·
80401144 (1) ·
80424470 (1) ·
80424695 (1) ·
80451679 (1) ·
80511310 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)