Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'City St. & Crane Creek ' (1) ·
'CR-515 & Indian River ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Indian River ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'IWW Halifax River ' (1) ·
'Okeechobee Waterway ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1) ·
'St. Lucie Canal/SR-76 ' (1) ·
'US 98-SR 80-WPB Canal ' (1) ·
'US-17-92 -St Johns River' (1) ·
'US-17-92-St Johns River ' (1)
'CR-714 Indian St. ' (1) ·
'EB Forest Hill Bld' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'NB SR 807 ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'SR 9 (I-95) ' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-520 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-710 EB ' (1) ·
'SR-710 WB ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SW 18TH ST. EB ' (1) ·
'US-1 ' (1) ·
'WB Forest Hill Bld' (1)
700006 (1) ·
700015 (1) ·
700061 (1) ·
700109 (1) ·
790174 (1) ·
790175 (1) ·
790196 (1) ·
790197 (1) ·
880100 (1) ·
890161 (1) ·
890162 (1) ·
894062 (1) ·
930475 (1) ·
930479 (1) ·
930480 (1) ·
930497 (1) ·
930498 (1) ·
930514 (1) ·
931004 (1) ·
934349 (1) ·
934907 (1) ·
934908 (1) ·
934909 (1) ·
934926 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'I-4EB-US-17-92 St Johns R' (1) ·
'I-4WB-US-17-92 St Johns R' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'US-1 - Crane Cr & City St' (1)
26195316 (1) ·
26210062 (1) ·
26210118 (1) ·
26210242 (1) ·
26280900 (1) ·
26390288 (1) ·
26390300 (1) ·
26403485 (1) ·
26404472 (1) ·
26411352 (1) ·
26411700 (1) ·
27004322 (1) ·
27004488 (1) ·
27093370 (1) ·
27363540 (1) ·
28043878 (1) ·
28212408 (1) ·
28240428 (1) ·
28240489 (1) ·
28500676 (1) ·
28500808 (1) ·
29134915 (1) ·
29135230 (1)
80042465 (1) ·
80042805 (1) ·
80043210 (1) ·
80045945 (1) ·
80052100 (1) ·
80052215 (1) ·
80095982 (1) ·
80101307 (1) ·
80101404 (1) ·
80102688 (1) ·
80102700 (1) ·
80151390 (1) ·
80271724 (1) ·
80271798 (1) ·
80304170 (1) ·
80360835 (1) ·
80430569 (1) ·
80444559 (1) ·
80444580 (1) ·
81011854 (1) ·
81012071 (1) ·
81190878 (1) ·
81191063 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)