Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-37 Canal ' (1) ·
'Canal ' (1) ·
'Drainage Canal ' (1) ·
'Halifax River ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'Miller Creek ' (1) ·
'Samsula Canal ' (1) ·
'Sebastian Canal West ' (1) ·
'Tomoka River ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1)
'Americana Blvd. ' (1) ·
'CENTRAL PK BL S EB' (1) ·
'CENTRL PK BL S WB' (1) ·
'Emerson Drive ' (1) ·
'Hunting Camp Road ' (1) ·
'Hurley Blvd ' (1) ·
'LPGA Blvd ' (1) ·
'Magnolia Avenue ' (1) ·
'Malabar Rd ' (1) ·
'Old Dixie Highway ' (1) ·
'Patti Drive ' (1) ·
'Tomoka Farms Rd ' (1) ·
'Volco Road ' (1) ·
'Wilden Road ' (1) ·
'Williams Road ' (1)
704004 (1) ·
704017 (1) ·
704086 (1) ·
705906 (1) ·
705918 (1) ·
705919 (1) ·
794008 (1) ·
794015 (1) ·
794038 (1) ·
794063 (1) ·
794123 (1) ·
794124 (1) ·
794131 (1) ·
794133 (1) ·
794185 (1) ·
934920 (1) ·
934921 (1)
'.15 mi W of Fleming Grant' (1) ·
'.7 mi S of Taylor Rd ' (1) ·
'0.2 Mi East of US-1 ' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'15ft. N of Pine Island Dr' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'AT US-441 (SR-7) ' (1) ·
'AT US-441 SR-7 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)