Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Inlet ' (1) ·
'BRANCH OF C-44 CANAL ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL ' (1) ·
'Daytona Canal ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'Halifax River ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE WORTH ' (1) ·
'LATERAL A CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'TAYLOR CREEK ' (1)
'101ST STREET ' (1) ·
'Ballough Street ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'COUNTY LINE RD ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-880 ' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'Highbridge Road ' (1) ·
'ISLAND ROAD ' (1) ·
'LE CHALET BLVD ' (1) ·
'Main Street ' (1) ·
'MARINA BLVD. ' (1) ·
'MURPHY RD ' (1) ·
'Southern Boulevard' (1) ·
'SR A1A ' (1)
794004 (1) ·
794025 (1) ·
795000 (1) ·
880044 (1) ·
884039 (1) ·
884053 (1) ·
884063 (1) ·
890015 (1) ·
894003 (1) ·
894021 (1) ·
930061 (1) ·
930097 (1) ·
930940 (1) ·
934487 (1) ·
934943 (1) ·
934944 (1) ·
935900 (1) ·
936802 (1) ·
940029 (1)
'.3 mi South of Mason Ave ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.3 Mile West of SR-A1A ' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.4MI W of S. COUNTY ROAD' (1) ·
'0.5 Mi W of SR-A1A ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'CR-615 (66TH AVE.) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)