Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Deck 058: Fair & Scour 113 : Bridge foundations (including piles) on dry land well above flood water elevations. or Other

Use the filters below to narrow your results.

ObjectID:
Status:
Direction 005e:
Critical 006b:
Facility 007:
Number 008:
Latitude 016:
Longitude 017:
Owner 022:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 5 (1) · 6 (1)
Traffic Year 030:
Length 049:
Width 052:
10 (1) · 11 (1) · 12 (1) · 14 (1) · 16 (1) · 18 (1) · 29 (1) · 30 (1) · 32 (1) · 6 (1) · 7 (1) · 8 (1) · 9 (1)
Deck 058: (Click arrow to add another value)
Superstructure 059:
Substructure 060:
Culvert 062:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future Year 115:
Clearance 116:

Showing below up to 41 results in range #1 to #41.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)