Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
884003 (1) ·
884053 (1) ·
884063 (1) ·
884064 (1) ·
885604 (1) ·
885605 (1) ·
894003 (1) ·
894019 (1) ·
894021 (1) ·
930030 (1) ·
930805 (1) ·
934943 (1) ·
934944 (1) ·
935900 (1)
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'300FT East of CR-717 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'AT 141st ST ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 14 results in range #1 to #14.