Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL ' (1) ·
'CR 709 & FECRR ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'Intracoastal Waterway ' (1) ·
'LATERAL A CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1)
'101ST STREET ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'COUNTY LINE RD ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-880 ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'MARINA BLVD. ' (1) ·
'MURPHY RD ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'Southern Boulevard' (1)
880044 (1) ·
884039 (1) ·
884053 (1) ·
884055 (1) ·
884063 (1) ·
890015 (1) ·
894003 (1) ·
894021 (1) ·
930097 (1) ·
930940 (1) ·
934943 (1) ·
934944 (1) ·
935900 (1) ·
940115 (1) ·
940116 (1)
'.5MI W of A1A & E of SR-5' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'CR-615 (66TH AVE.) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)