Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL ' (1) ·
'CR 709 & FECRR ' (1) ·
'CSX RAILROAD ' (1) ·
'Daytona Canal ' (1) ·
'E-1 CANAL ' (1) ·
'E-1-E CANAL ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'Intracoastal Waterway ' (1) ·
'LATERAL A CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'N RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'US-17/92 ' (1)
'101ST STREET ' (1) ·
'Ballough Street ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'COUNTRY CLUB DRIVE' (1) ·
'COUNTY LINE RD ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-880 ' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'LE CHALET BLVD ' (1) ·
'MARINA BLVD. ' (1) ·
'MURPHY RD ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'PLM BEACH LAKES BL' (1) ·
'SB I-95 (SR 9) ' (1) ·
'Southern Boulevard' (1) ·
'SR-472 ' (1)
790055 (1) ·
795000 (1) ·
880044 (1) ·
884039 (1) ·
884053 (1) ·
884055 (1) ·
884063 (1) ·
890015 (1) ·
894003 (1) ·
894021 (1) ·
930097 (1) ·
930940 (1) ·
934487 (1) ·
934943 (1) ·
934944 (1) ·
935900 (1) ·
937709 (1) ·
940115 (1) ·
940116 (1)
'.3 mi South of Mason Ave ' (1) ·
'.5MI W of A1A & E of SR-5' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.1MI W OF DIXIE HIGHWAY ' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.2MI E OF SR-7 (US-441) ' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1.1MI NW OF HIGH MEADOW ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'50FT E OF SR-7 (US-441) ' (1) ·
'50FT. S OF 30TH STREET ' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-472 over US-17/92 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.