Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BRANCH OF C-44 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'CANAL ' (1) ·
'COLLIER CREEK ' (1) ·
'CR 709 & FECRR ' (1) ·
'EAST TURTLE CREEK ' (1) ·
'FECRR ' (1) ·
'L-10 Canal ' (1) ·
'LATERAL A CANAL ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'N RELIEF CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'POPPELTON CREEK ' (1) ·
'Ten Mile Creek ' (1) ·
'US-17/92 ' (1)
'101ST STREET ' (1) ·
'109TH STREET ' (1) ·
'97 TH STREET ' (1) ·
'BARBER STREET ' (1) ·
'BEL LIDO DRIVE ' (1) ·
'COUNTY LINE RD ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-880 ' (1) ·
'CR714 PALM CITY RD' (1) ·
'CR726(CITRUS BLVD)' (1) ·
'Levee Road ' (1) ·
'NB I-95 (SR 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SR-472 ' (1) ·
'US-1 NB ' (1)
790055 (1) ·
790087 (1) ·
880044 (1) ·
884003 (1) ·
884039 (1) ·
884055 (1) ·
884063 (1) ·
884064 (1) ·
885605 (1) ·
890015 (1) ·
890039 (1) ·
894019 (1) ·
894021 (1) ·
930805 (1) ·
930940 (1) ·
935900 (1) ·
940115 (1) ·
940116 (1) ·
940122 (1) ·
940123 (1)
'.5 miles South of SR-70 ' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.3MI W OF CR-507 ' (1) ·
'0.3MI WEST OF CR-507 ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1/2MI S of US-1 ' (1) ·
'2.5Mi W of US-1 ' (1) ·
'200ft. W of A1A ' (1) ·
'3.2MI W OF US-1 ' (1) ·
'3.6 Mi. E of SR-710 ' (1) ·
'300FT East of CR-717 ' (1) ·
'AT 141st ST ' (1) ·
'CR-615 (66TH AVE.) ' (1) ·
'SR-472 over US-17/92 ' (1) ·
'US-1 NB - FECRR ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)