Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'C-44 Intake Canal ' (1) ·
'C-54 Canal ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer WIldlife Crossing ' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'Lateral B Canal ' (1) ·
'Spruce Creek ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'St. Johns River ' (1)
700237 (1) ·
700238 (1) ·
790203 (1) ·
790204 (1) ·
790206 (1) ·
790219 (1) ·
790227 (1) ·
790247 (1) ·
884105 (1) ·
894057 (1) ·
930381 (1) ·
930552 (1) ·
931013 (1) ·
940162 (1) ·
940163 (1)
'1.5mi N of SR-68 ' (1) ·
'1.74 Miles E of SR-710 ' (1) ·
'3 MI NORTH OF PGA BLVD ' (1) ·
'At CR-613 (58th Ave.) ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-4 WB over Bear Crossing' (1) ·
'I-95 NB over Spruce Creek' (1) ·
'Palm Beach Garden Interch' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'SR 400 - Dear Crossing ' (1) ·
'SR 400 EB - Bear Crossing' (1) ·
'SR 400 EB - Cougar Crossi' (1) ·
'SR-415- St.Johns River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)