Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boca Inlet ' (1) ·
'Canoe Creek ' (1) ·
'El Rio Canal ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'El Rio Canal E-4 ' (1) ·
'GARDEN CANAL ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK(GLADES RD INT)' (1)
'A1A ' (1) ·
'CAMINO GARDENS BL ' (1) ·
'CAMINO REAL ' (1) ·
'E. CAMINO REAL ' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'EB SR808 Glades Rd' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'Spanish River Blvd' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'SW 18TH ST WB ' (1) ·
'WB Spanish River ' (1)
930015 (1) ·
930060 (1) ·
930154 (1) ·
930189 (1) ·
930199 (1) ·
930201 (1) ·
930226 (1) ·
930248 (1) ·
930319 (1) ·
930416 (1) ·
930450 (1) ·
934408 (1) ·
934925 (1) ·
934960 (1) ·
935206 (1) ·
935222 (1) ·
935223 (1)
'0.1MI E of SW 9TH AVE ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.5Mi E of Military Trail' (1) ·
'Boca Raton ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'SR 808 I 95 Interchange ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
10930 (1) ·
15528 (1) ·
157018 (1) ·
17360 (1) ·
177838 (1) ·
185298 (1) ·
19258 (1) ·
20994 (1) ·
28050 (1) ·
31199 (1) ·
41640 (1) ·
53785 (1) ·
67665 (1) ·
7636 (1) ·
99763 (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)