Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12116 (1) ·
12117 (1) ·
12132 (1) ·
12212 (1) ·
12224 (1) ·
12229 (1) ·
12231 (1) ·
12235 (1) ·
12246 (1) ·
12258 (1) ·
12269 (1) ·
12273 (1) ·
12274 (1) ·
17854 (1) ·
17859 (1) ·
17860 (1) ·
17864 (1) ·
17869 (1) ·
17870 (1) ·
17871 (1) ·
17872 (1) ·
17880 (1) ·
17893 (1) ·
17905 (1) ·
17907 (1) ·
17910 (1) ·
17913 (1)
'Canal ' (1) ·
'Canal 15 ' (1) ·
'CR-5A ' (1) ·
'Crane Creek ' (1) ·
'Crane Creek Canal L-7 ' (1) ·
'Drainage Ditch ' (1) ·
'Eau Gallie River ' (1) ·
'Eau-Gallie River ' (1) ·
'Elbow Creek ' (1) ·
'I-95 ' (1) ·
'Indian River IWW ' (1) ·
'Indian River Relief ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SR-507 ' (1) ·
'Turkey Creek ' (1) ·
Horse Creek (1) ·
Indian River ICW (1) ·
Lake Washington Road (1) ·
Sawgrass Creek (1) ·
St Johns River (1) ·
St Johns River Relief (1) ·
St. Johns River (1)
'Apollo Boulevard ' (1) ·
'Croton Road ' (1) ·
'Dubber Road ' (1) ·
'Fountainhead Blvd.' (1) ·
'I-95 ' (1) ·
'John Rodes Blvd. ' (1) ·
'Pineda Causeway ' (1) ·
'Pinehurst Ave N ' (1) ·
'SR-507 ' (1) ·
'SR-518 ' (1) ·
'St. Johns Heritage' (1) ·
'US-1 ' (1) ·
'US-192 ' (1) ·
'US-192 EB ' (1) ·
'US-192 WB ' (1) ·
'Wickham Road ' (1) ·
'Willowood Drive ' (1) ·
I-95 SB (1) ·
SR-518 (1) ·
US-1 (1) ·
US-192 EB (1) ·
US-192 WB (1)
700007 (1) ·
700008 (1) ·
700033 (1) ·
700043 (1) ·
700156 (1) ·
700172 (1) ·
700174 (1) ·
700181 (1) ·
700184 (1) ·
700186 (1) ·
700191 (1) ·
700203 (1) ·
700206 (1) ·
700212 (1) ·
700213 (1) ·
700214 (1) ·
700215 (1) ·
700225 (1) ·
704032 (1) ·
704045 (1) ·
704176 (1) ·
704188 (1) ·
704190 (1) ·
704197 (1) ·
705601 (1) ·
705603 (1) ·
705604 (1)
'.21 E of Minton Rd. ' (1) ·
'.5 Mi W of SR-507 ' (1) ·
'0.1 mi E of Wickham Road ' (1) ·
'0.2 Mile S of Aurora Road' (1) ·
'0.2 Miles East of US-1 ' (1) ·
'0.9 mi N of Wickham Rd ' (1) ·
'1.35Mi N of US-192 ' (1) ·
'100 ft West of Ruffner Rd' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'2.9 Miles South of US-192' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'CR-509 .5 Mi N of SR-518 ' (1) ·
'SR-507 over Crane Creek ' (1) ·
'SR-518 over Eau-Gallie R.' (1) ·
'US-1 over Elbow Creek ' (1) ·
'US-1 over Turkey Creek ' (1) ·
'US-1- Eau Gallie River ' (1) ·
'US-192 EB - Indian River ' (1) ·
'US-192 WB-Indian River ' (1) ·
I-95 NB and CR-5A (1) ·
I-95 SB -Lk Washington Rd (1) ·
SR-518 over Indian River (1) ·
US-1 over Horse Creek (1) ·
US-192 EB-St Johns Relief (1) ·
US-192 EB-St Johns River (1) ·
US-192 WB - Sawgrass Cr. (1) ·
US-192 WB- St Johns River (1)
28015978 (1) ·
28024500 (1) ·
28030000 (1) ·
28040738 (1) ·
28042875 (1) ·
28044331 (1) ·
28045218 (1) ·
28050237 (1) ·
28050339 (1) ·
28050471 (1) ·
28050547 (1) ·
28052963 (1) ·
28053134 (1) ·
28055660 (1) ·
28070512 (1) ·
28070604 (1) ·
28072700 (1) ·
28073710 (1) ·
28074371 (1) ·
28075785 (1) ·
28075792 (1) ·
28080403 (1) ·
28084584 (1) ·
28100028 (1) ·
28113278 (1) ·
28143333 (1) ·
28461701 (1)
80344732 (1) ·
80352939 (1) ·
80352988 (1) ·
80355880 (1) ·
80370269 (1) ·
80371675 (1) ·
80373635 (1) ·
80374336 (1) ·
80374655 (1) ·
80375049 (1) ·
80384071 (1) ·
80384610 (1) ·
80390094 (1) ·
80391820 (1) ·
80400400 (1) ·
80401763 (1) ·
80401823 (1) ·
80411355 (1) ·
80420110 (1) ·
80422180 (1) ·
80422723 (1) ·
80448000 (1) ·
80450403 (1) ·
80450449 (1) ·
80454978 (1) ·
80494825 (1) ·
80533778 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 27 results in range #1 to #27.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)