Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-24 CANAL ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CR 708 ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'FECRR ' (1) ·
'HAULOVER CANAL ' (1) ·
'I-95 ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'SR-406 ' (1) ·
'SR-46 ' (1) ·
'SR-91 TPK(GLADES RD INT)' (1) ·
'TAYLOR CREEK ' (1) ·
'Turkey Creek ' (1) ·
'US-1 ' (1) ·
Wickham Road (1)
'COURTENAY PARKWAY ' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'Dairy Rd ' (1) ·
'Hull Road ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'LPGA Blvd ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SHINN ROAD ' (1) ·
'SR-405 WB ' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91SB ON/OFF 76.4' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1) ·
I-95 (1)
700029 (1) ·
700059 (1) ·
700134 (1) ·
700135 (1) ·
700203 (1) ·
700222 (1) ·
700230 (1) ·
703004 (1) ·
790079 (1) ·
790087 (1) ·
790171 (1) ·
890117 (1) ·
890118 (1) ·
930335 (1) ·
930336 (1) ·
930450 (1) ·
930497 (1) ·
930498 (1) ·
940018 (1) ·
940026 (1) ·
940029 (1) ·
940121 (1)
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'3MI S of SR-70 ' (1) ·
'8.6 MILES SOUTH OF US 1 ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'BOCA RATON INTERCHNG #28 ' (1) ·
'Dairy Rd - I-95 ' (1) ·
'Hull Road - I-95 ' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 over SR-46 ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR-405 WB - US-1 ' (1) ·
'US-1 NB - FECRR ' (1) ·
'US-1 over Turkey Creek ' (1) ·
I-95 over Wickham Road (1)
26222805 (1) ·
26280900 (1) ·
26502240 (1) ·
26502290 (1) ·
27023771 (1) ·
27023967 (1) ·
27122264 (1) ·
27163478 (1) ·
27201709 (1) ·
27275808 (1) ·
28015978 (1) ·
28134900 (1) ·
28314034 (1) ·
28365858 (1) ·
28365910 (1) ·
28381369 (1) ·
28395825 (1) ·
28441095 (1) ·
28493662 (1) ·
29131187 (1) ·
29162634 (1)
80052100 (1) ·
80052215 (1) ·
80060655 (1) ·
80060720 (1) ·
80101517 (1) ·
80140214 (1) ·
80140445 (1) ·
80194850 (1) ·
80213627 (1) ·
80282441 (1) ·
80285306 (1) ·
80344732 (1) ·
80430700 (1) ·
80451679 (1) ·
80472222 (1) ·
80510378 (1) ·
80510486 (1) ·
80511328 (1) ·
80512802 (1) ·
80521049 (1) ·
81061122 (1) ·
81071887 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)