Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 W.P.B. CANAL ' (1) ·
'CR-3 ' (1) ·
'Earman River (C-17) ' (1) ·
'George King Blvd ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'Indian River Relief ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR-524 ' (1) ·
'SR-91 (FL. TPK.) ' (1) ·
'West Palm Beach Canal ' (1) ·
George King Blvd (1)
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'NW 5TH STREET ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'Service Road ' (1) ·
'SR-404 EB ' (1) ·
'SR-76(Kanner Hwy )' (1) ·
'SR-A1A NB ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-98 SR700 US441 ' (1) ·
SR-A1A SB (1)
700054 (1) ·
700128 (1) ·
700145 (1) ·
700210 (1) ·
700211 (1) ·
704048 (1) ·
890126 (1) ·
930003 (1) ·
930030 (1) ·
930409 (1) ·
930410 (1) ·
930416 (1) ·
930465 (1) ·
931001 (1)
'.25mi W OF I-95 ' (1) ·
'0.2 mile East of US-1 ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'I-95 NB - SR-524 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'Just North of SR-850 ' (1) ·
'SR-404 EB over CR-3 ' (1) ·
'SR-7 & SR-80 intersection' (1) ·
'SR-700 CANAL POINT ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'SR-A1A - George King Blvd' (1) ·
SR-A1A SB- George King (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)