Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'17th Avenue North ' (1) ·
'6th Avenue South ' (1) ·
'Boynton Canal C-16 ' (1) ·
'CR 702 45th Street ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'Lake Ida Canal E-4 ' (1) ·
'Military Trail ' (1) ·
'Northlake Blvd. ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'WPB Drainage Canal ' (1)
930259 (1) ·
930287 (1) ·
930294 (1) ·
930378 (1) ·
930458 (1) ·
930490 (1) ·
930516 (1) ·
930519 (1) ·
930520 (1) ·
930540 (1) ·
940160 (1) ·
940161 (1)
'0.25 mile North of SR 786' (1) ·
'0.7 mile North of SR 804 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'2.7 miles N of SR 806 ' (1) ·
'At Exit 74 ' (1) ·
'At Exit 76 ' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Between SR 710 and 786 ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'I-95 / SR 882 ' (1) ·
'Lake Worth ' (1)
116000 (1) ·
160500 (1) ·
17500 (1) ·
1800 (1) ·
195661 (1) ·
213000 (1) ·
226000 (1) ·
232000 (1) ·
236000 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
201260 (1) ·
278468 (1) ·
30363 (1) ·
3123 (1) ·
339472 (1) ·
369555 (1) ·
392110 (1) ·
402520 (1) ·
409460 (1)
Showing below up to 12 results in range #1 to #12.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)