Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River Relief East' (1) ·
'Banana River Relief West' (1) ·
'DRAINAGE CANAL ' (1) ·
'DRAINAGE DITCH ' (1) ·
'Halifax River ' (1) ·
'Indian River Relief ' (1) ·
'LAT CANAL (LK WORTH INT)' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'N RELIEF CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
Banana River Relief (1)
'AVENUE OF PGA ' (1) ·
'CR 613 (58TH AVE) ' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-A1A ' (1) ·
'SR510 Wabasso Road' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 125.2' (1) ·
'SR91 N/S TPK 127.3' (1) ·
'SR91 N/S TPK 139.7' (1) ·
'SR91 N/S TPK 147.7' (1) ·
'SR91 N/S TPK 153.7' (1) ·
'SR91 N/S TPK 154.3' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 NB TPK 144.6 ' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 144.6 ' (1) ·
SR-520 (1)
700080 (1) ·
700082 (1) ·
700146 (1) ·
700148 (1) ·
700192 (1) ·
790147 (1) ·
880052 (1) ·
884055 (1) ·
890075 (1) ·
890077 (1) ·
930241 (1) ·
930334 (1) ·
937005 (1) ·
940049 (1) ·
940061 (1) ·
940064 (1) ·
940082 (1) ·
940104 (1) ·
940105 (1) ·
940106 (1) ·
940110 (1)
'0.1 MI S of PGA BLVD ' (1) ·
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.25MI SOUTH OF SR-708 ' (1) ·
'0.4MI N OF 49TH ST. ' (1) ·
'0.51 MI NORTH OF SR-70 ' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.74 MI N OF ST LUCIE BLV' (1) ·
'1.2 MI NORTH OF SR-70 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.6 MI N OF MARTIN CO ' (1) ·
'1.8MI NORTH OF SR-708 ' (1) ·
'2.85 MI SOUTH OF SR-712 ' (1) ·
'A1A-Port Orange Relief ' (1) ·
'LAKE WORTH INTERCHANGE ' (1) ·
'SR-404 EB-Banana Riv Rel ' (1) ·
'SR-404 EB-Banana River ' (1) ·
'SR-404 WB-Banana River ' (1) ·
SR-520 - Banana River (1)
26371314 (1) ·
26501040 (1) ·
26571548 (1) ·
27022544 (1) ·
27041173 (1) ·
27133752 (1) ·
27154481 (1) ·
27154501 (1) ·
27173677 (1) ·
27173720 (1) ·
27201626 (1) ·
27250685 (1) ·
27253205 (1) ·
27413662 (1) ·
27451178 (1) ·
28123224 (1) ·
28123289 (1) ·
28124312 (1) ·
28124379 (1) ·
28212829 (1) ·
29083964 (1)
80071574 (1) ·
80095581 (1) ·
80101893 (1) ·
80142184 (1) ·
80144523 (1) ·
80202976 (1) ·
80210806 (1) ·
80210855 (1) ·
80221024 (1) ·
80221116 (1) ·
80222735 (1) ·
80242270 (1) ·
80244387 (1) ·
80254429 (1) ·
80264603 (1) ·
80365438 (1) ·
80371385 (1) ·
80371403 (1) ·
80380201 (1) ·
80380233 (1) ·
80590233 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 21 results in range #1 to #21.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)