Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CONGRESS AVE NB ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'Dunn Avenue ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'JOG ROAD SB ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'SR-407 ' (1) ·
'SR-472 WB ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'St. Johns Heritage' (1)
700091 (1) ·
700197 (1) ·
700198 (1) ·
704190 (1) ·
790190 (1) ·
794189 (1) ·
931003 (1) ·
934160 (1) ·
934161 (1) ·
934915 (1) ·
934918 (1) ·
934930 (1) ·
934933 (1) ·
934937 (1) ·
935308 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'2.9 Miles South of US-192' (1) ·
'4.2MI NORTH OF SR-528 ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 WB at I-95 ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.