Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12140 (1) ·
12141 (1) ·
12145 (1) ·
12193 (1) ·
12195 (1) ·
12198 (1) ·
12243 (1) ·
13684 (1) ·
13685 (1) ·
13688 (1) ·
13689 (1) ·
13690 (1) ·
13691 (1) ·
13695 (1) ·
13696 (1) ·
13700 (1) ·
13701 (1) ·
17866 (1) ·
17878 (1) ·
17883 (1) ·
17885 (1) ·
17886 (1) ·
17890 (1) ·
17891 (1) ·
17892 (1) ·
18734 (1) ·
18759 (1) ·
18760 (1) ·
18761 (1)
'Aurantia Rd. ' (1) ·
'Beamer's Canal ' (1) ·
'Beamer's Ditch ' (1) ·
'C-54 Canal ' (1) ·
'Fellsmere Canal ' (1) ·
'I-95 ' (1) ·
'Maytown Rd. ' (1) ·
'Maytown Road ' (1) ·
'Spruce Creek ' (1) ·
'SR-40 ' (1) ·
'SR-406 ' (1) ·
'SR-421 ' (1) ·
'SR-44 ' (1) ·
'SR-442 ' (1) ·
'SR-50 ' (1) ·
'Tomoka River ' (1) ·
'US-1 ' (1) ·
'US-192 ' (1) ·
Addison Canal (1) ·
Fellsmere Canal (1) ·
Wickham Road (1)
700058 (1) ·
700059 (1) ·
700066 (1) ·
700132 (1) ·
700134 (1) ·
700138 (1) ·
700199 (1) ·
700209 (1) ·
700222 (1) ·
700229 (1) ·
700231 (1) ·
700232 (1) ·
700236 (1) ·
700237 (1) ·
700238 (1) ·
790058 (1) ·
790059 (1) ·
790062 (1) ·
790063 (1) ·
790064 (1) ·
790065 (1) ·
790077 (1) ·
790078 (1) ·
790082 (1) ·
790083 (1) ·
790193 (1) ·
790221 (1) ·
790227 (1) ·
790229 (1)
'0.9mi S of SR-520 ' (1) ·
'4.5 Mi. N of SR-46 ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-95 NB - Maytown Road ' (1) ·
'I-95 NB - SR-44 ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 NB over Spruce Creek' (1) ·
'I-95 NB over SR-406 ' (1) ·
'I-95 NB over SR-421 ' (1) ·
'I-95 NB over SR-442 ' (1) ·
'I-95 NB over SR-50 ' (1) ·
'I-95 NB over US-1 ' (1) ·
'I-95 over SR-40 ' (1) ·
'I-95 over US-192 ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'I-95 SB-Maytown Road ' (1) ·
'N of Bellevue Overpass ' (1) ·
'Over Fellsmere Canal ' (1) ·
'Port St. John Pkwy - I-95' (1) ·
I-95 over Addison Canal (1) ·
I-95 over Wickham Road (1) ·
Over Fellsmere Canal (1)
27493308 (1) ·
27493323 (1) ·
27493726 (1) ·
27493735 (1) ·
28044400 (1) ·
28134900 (1) ·
28205754 (1) ·
28271350 (1) ·
28314000 (1) ·
28330609 (1) ·
28330662 (1) ·
28365858 (1) ·
28365910 (1) ·
28434007 (1) ·
28434100 (1) ·
28495879 (1) ·
28495944 (1) ·
28570264 (1) ·
28570267 (1) ·
29004602 (1) ·
29004609 (1) ·
29052700 (1) ·
29062200 (1) ·
29100540 (1) ·
29152514 (1) ·
29154558 (1) ·
29154580 (1) ·
29200900 (1) ·
29200964 (1)
80332834 (1) ·
80332921 (1) ·
80333220 (1) ·
80333306 (1) ·
80422199 (1) ·
80430700 (1) ·
80471577 (1) ·
80491650 (1) ·
80510378 (1) ·
80510486 (1) ·
80510507 (1) ·
80510633 (1) ·
80510650 (1) ·
80531567 (1) ·
80531664 (1) ·
80544266 (1) ·
80544355 (1) ·
80570125 (1) ·
80570342 (1) ·
80591524 (1) ·
80591757 (1) ·
81011300 (1) ·
81014200 (1) ·
81045860 (1) ·
81065740 (1) ·
81070414 (1) ·
81070520 (1) ·
81075150 (1) ·
81075240 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 29 results in range #1 to #29.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)