Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BESSEY CREEK ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'I-4 EB Ramp B ' (1) ·
'IWW Indian River ' (1) ·
'Lake Washington Road ' (1) ·
'Middle Haw Creek ' (1) ·
'Padgett Creek ' (1) ·
'PHIPP CANAL ' (1) ·
'Service Rd & Canal ' (1) ·
'SR 710 & SCL RR ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1) ·
'Tomoka River ' (1)
700030 (1) ·
700031 (1) ·
700117 (1) ·
700123 (1) ·
790027 (1) ·
790099 (1) ·
790106 (1) ·
790172 (1) ·
790920 (1) ·
790941 (1) ·
890082 (1) ·
890085 (1) ·
930142 (1) ·
930159 (1) ·
930239 (1) ·
930416 (1)
'1.0MI NORTH OF SR-708 ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'3.33 Miles S/O PGA BLVD ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'I-4 WB over I-4 EB Ramp B' (1) ·
'I-95 NB -Lk Washington Rd' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'WEST PALM BEACH INTERCH. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)