Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700056 (1) ·
884068 (1) ·
930401 (1) ·
934214 (1) ·
934319 (1) ·
935201 (1) ·
935202 (1) ·
935203 (1) ·
945014 (1) ·
945251 (1)
'0.1Mi S OF CR812 LANTANA ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.3 Miles North of CR-68 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'0.5 Mi S of SR-407 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)