Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th Street Canal ' (1) ·
'B-19 Canal ' (1) ·
'Bessey Creek ' (1) ·
'C-59 Canal ' (1) ·
'Canal ' (1) ·
'Canal 15 ' (1) ·
'FPL Cooling Disch. Canal' (1) ·
'FPL Cooling Intake Canal' (1) ·
'Gabordy's Canal ' (1) ·
'Goat Creek ' (1) ·
'Groover Creek ' (1) ·
'Halifax Canal ' (1) ·
'Hanson Grant Outlet ' (1) ·
'Indian River ' (1) ·
'Little Tomoka River ' (1) ·
'Nova Canal ' (1) ·
'Pluckebaum Canal ' (1) ·
'Sebastian Canal ' (1)
'Barwick Rd. ' (1) ·
'Barwick Road ' (1) ·
'Fort Florida Road ' (1) ·
'Harrison Street ' (1) ·
'I-95 (SR-9) ' (1) ·
'John Rodes Blvd. ' (1) ·
'Magnolia St. ' (1) ·
'Micco Rd. ' (1) ·
'Pace Drive ' (1) ·
'Range Rd ' (1) ·
'Riverside Dr ' (1) ·
'S. Burnett Rd ' (1) ·
'SW 48th Avenue ' (1) ·
'Tymber Creek Road ' (1) ·
'Valkaria Road ' (1) ·
'Williamson Blvd ' (1) ·
'Willow Run Blvd. ' (1) ·
'Woodcliff Drive ' (1)
704035 (1) ·
704095 (1) ·
704188 (1) ·
704193 (1) ·
704194 (1) ·
705100 (1) ·
705925 (1) ·
794042 (1) ·
794072 (1) ·
794076 (1) ·
794077 (1) ·
794078 (1) ·
794079 (1) ·
794096 (1) ·
794194 (1) ·
795001 (1) ·
795729 (1) ·
796401 (1) ·
890139 (1) ·
894061 (1)
'.2mi W of Clyde Morris Bl' (1) ·
'0.1MI E of Riveredge Blvd' (1) ·
'0.1Mi S of LPGA Blvd ' (1) ·
'0.2 mile west of US-17 ' (1) ·
'0.2 Miles North of SR 40 ' (1) ·
'0.75 Mi. South of SR-520 ' (1) ·
'0.8mi. N of CR-714 ' (1) ·
'1.35Mi N of US-192 ' (1) ·
'1.4 miles North of US-92 ' (1) ·
'1.6 miles North of SR-40 ' (1) ·
'10ft. East of Nova Road ' (1) ·
'2 Mi West of Jupiter Blvd' (1) ·
'2 mi West of US-1 ' (1) ·
'2.5 Miles West of US-1 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'At Pluckebaum Rd ' (1) ·
'I-95 (2 mi. N. of SR-76) ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)