Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Service Under 042b:
Highway - Waterway
& Superstructure 059:
Very Good
& Culvert 062:
Other
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'FL TPK SR-91 ' (1) ·
'FL. TURNPIKE ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Okeechobee Waterway ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'Turnpike (SR-91) ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
894062 (1) ·
930497 (1) ·
930514 (1) ·
931004 (1) ·
934166 (1) ·
934367 (1) ·
934925 (1) ·
934926 (1) ·
934945 (1) ·
934946 (1) ·
940092 (1) ·
940093 (1) ·
940113 (1) ·
940114 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1) ·
'4.3 MI NORTH OF SR-802 ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
10875 (1) ·
133595 (1) ·
176174 (1) ·
25375 (1) ·
32445 (1) ·
32965 (1) ·
37302 (1) ·
40773 (1) ·
41640 (1) ·
67231 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)