Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
890090 (1) ·
890106 (1) ·
890161 (1) ·
890162 (1) ·
930038 (1) ·
930120 (1) ·
930121 (1) ·
930344 (1) ·
930351 (1) ·
930362 (1) ·
930534 (1) ·
930535 (1) ·
930536 (1) ·
930910 (1) ·
930940 (1)
'.5mi W. of N. Lake Blvd. ' (1) ·
'0.1MI W of US-98 / SR-441' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.5mi East of SR-786 ' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'3 Miles West of SR-786 ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'5.8 Miles West of SR-76 ' (1) ·
'7.7Mi W OF SR-80 ' (1) ·
'8.9 miles west of SR-76 ' (1) ·
'CR 880 AT SIX MILE BEND ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)