Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOLLES CANAL (L-21) ' (1) ·
'C-18 Canal ' (1) ·
'DRAINAGE CANAL ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'Jupiter Creek ' (1) ·
'L-5 Canal ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'Miami Canal L-25 ' (1) ·
'SLOUGH ' (1) ·
'SR-91 (Fla. Turnpike) ' (1)
930054 (1) ·
930342 (1) ·
930352 (1) ·
930353 (1) ·
930374 (1) ·
930391 (1) ·
930420 (1) ·
930453 (1) ·
930454 (1) ·
930512 (1) ·
930513 (1) ·
930537 (1) ·
930538 (1) ·
934142 (1) ·
934144 (1)
'.5 mi East of I-95 ' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'2.35MI E OF HENDRY CO LIN' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'At John Stretch Park ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'Palm Beach - Broward Line' (1) ·
'Tpk. / SR 706 Interchange' (1) ·
'US-27 OVER BOLLES CANAL ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)